1. Project cost budgeting ability - help you budget costs, control risks, and improve your bidding ability!
1. Watch the scene
2. Look at the drawings
3. Technical exchange of Party A or Design Institute
4. Preliminary design of the plan
5. Materials Engineering Budget
2. Project docking capability - helps you save manpower, control costs, and reassure you!
1. Deepen the drawings of large data center systems
2. Review the technical plan to determine the engineering interface
3. Detailed construction plan
4. Assessment and Avoidance of Construction Risks
5. Review and correction of construction drawings (photographs - feedback - confirmation)
6. Quotation plan
3. Project implementation capabilities - handle things according to the process and construct according to the standards, so that you can save you worry!
1. Construction organization plan
2. Construction materials budget and preparation
3. Construction tool preparation
4. Construction personnel preparation (training of outsourced personnel team)
5. Construction technology control
(The unit is hoisted in place, oil circuit system, smoke exhaust system, air inlet and exhaust system, refueling and replenishing system, top wall noise reduction, computer room lighting, computer room electrical engineering)
6. Construction plan
7. Construction materials verification
8. Construction procedures
9. Preparation of construction conditions (material tool placement, site power supply, etc.)
10. Construction site coordination and management
4. Project delivery capability - Turnkey service will satisfy you!
1. Preparation and declaration of completion acceptance materials
2. System debugging, acceptance, training